Will extensions of time be available for filing an appeal brief, a reply in response to a new ground of rejection in an examiner's answer, and a reply brief for a patent application?
保存版の掲載情報です。最新の営業状況・料金・利用条件は出典をご確認ください。
保存されている情報
Document Time period for filing Are extensions of time under § 1.136(a) available for patent applications Are extensions of time under § 1.136(b) available for patent applications? Are extensions of time under § 1.550(c) available for ex partereexamination proceedings? Appeal brief Two (2) months…
- Current entry point
- Answer details at www.uspto.gov/patents/ptab/faqs, PTAB trials via Patent Center (verified 2026-09-29)
- Legacy system and where it moved
- No site-wide statement on the page (verified 2026-09-29)
- Fee
- Confirmed per answer on the page (no site-wide statement, verified 2026-09-29)
- What you need (account or API key)
- Confirmed per answer on the page (no site-wide statement, verified 2026-09-29)
原データ更新日:2026-10-06
保存版に記録された日付です。今回の実装・デプロイ日ではありません。